Projects
  • KAUST - Retaining Wall
    KAUST - Retaining Wall
    A curved retaining wall of 1,800 linear meter and a 9 meter high, was poured with combination of shutters systems....
  • KAUST - Chemical Warehouse
    KAUST - Chemical Warehouse
    A very high standards and execution quality was requested by the consultant (Saudi Aramco)...
  • KAUST - 21 Central
    KAUST - 21 Central
    Big portion of concrete were poured at one time (1500m3) for the two levels parking building “21 Central” to be done at quick phase. B21 Central & Plaza had to be divided into two sections to create a service corridor to allow concrete & martial supply of fast...
  • KAUST - 21 North
    KAUST - 21 North
    Building “21 North“is a 2 level parking lot of an area 22,000 m3 which was completed in five months time....
  • KSUHS
    KSUHS
    In one of the biggest universities in Riyadh,the Administration Building a 3 Level Basement+ 15 levels of which more than 20% of the built up areas is triple heights. We had to use around 850 bolts where fixed in the GF slab for precast columns....
  • Jabal Omar Development Tower - Mecca
    Jabal Omar Development Tower - Mecca
    Overlooking the Holy Haram in Makkah, a 5 star Hotel made of 8 level basements +G+42 levels a52,Doka auto-climbing system is used for the core walls. 12 meters high columns were poured as one go and more than 2,000 sqm of vertical elements of formwork was us...